wind-Indevelopment

Nonowie Wind Farm

The Nonowie Wind Farm is a proposed clean energy project west of Whyalla. The proposed site is approximately 22,500 hectares and located within the Whyalla City Council area, near the Lincoln Highway. The Project will connect into the National Electricity Market and would generate enough clean energy to power around 570,000 homes across Whyalla, the Eyre Peninsula and South Australia.

Nonowie Wind Farm is located approximately 10km west of Whyalla in South Australia. Lincoln Highway (B100) passes through the centre of site, and Eight Mile Creek Road borders the southeast corner of the site.

Nonowie Wind Farm is still in the early stages of design, you can view the draft concept design below:
Draft Concept Design

Since October 2023, Tilt Renewables have been using three meteorological masts placed on the site to record wind and environmental data. This data will inform the design and feasibility of the Project.

We are continuing to undertake several feasibility studies and surveys of the site, including ecological surveys.

These assessments help inform the design of the Nonowie Wind Farm. We will share our findings from these studies at public drop in sessions.

Project Status:

In Development

Maximum Capacity:

1200 MW

Location:

10km west of Whyalla, South Australia

Turbines:

Up to 150

Blade Tip Height:

Up to 250m

Further Details

Use the following links below to find out more about the Project:

Newsletters

Newsletters are an important part of Tilt Renewables’ community engagement and will increase in frequency as the Project develops.

Visit this page regularly to ensure you receive all updates related to the Nonowie Wind Farm.

Factsheets

The following factsheet provides answers to our frequently asked questions:

Mailing list

To subscribe to our newsletter mailing list, please click here

Goods and services register

 

To register interest in providing goods or services for the  for the Nonowie Wind Farm project, please complete the Goods and Services Register.

 

General

 

For further information on the Nonowie Wind Farm please contact the project team at nonowie@tiltrenewables.com or on 1800 WE TILT (938 458)

 

Complaints

 

If you have a complaint, please contact us at complaints@tiltrenewables.com or on 1800 WE TILT (938 458).

You can find Tilt Renewables’ Complaints Handling Procedure here.

Stay up to date with everything at Tilt.